{"id":9501,"date":"2026-03-18T09:54:16","date_gmt":"2026-03-18T08:54:16","guid":{"rendered":"https:\/\/staging1.rkp-marketing.at\/?post_type=projekt&#038;p=9501"},"modified":"2026-03-18T14:39:07","modified_gmt":"2026-03-18T13:39:07","slug":"uksh-schleswig-holstein-campus-kiel","status":"publish","type":"projekt","link":"https:\/\/staging1.rkp-marketing.at\/en\/projekt\/uksh-schleswig-holstein-campus-kiel\/","title":{"rendered":"UKSH Schleswig-Holstein Campus Kiel"},"content":{"rendered":"<h2 class=\"wp-block-heading\">The project<\/h2>\n\n\n\n<p>On the Kiel Campus of the University Hospital Schleswig-Holstein (UKSH), the Surgery and Operating Centre in Building 518 has undergone comprehensive renovation and medical-technical modernisation. Additional operating and procedure rooms have been created, and new examination equipment, such as MRI, CT, and X-ray systems, has been integrated. Furthermore, office, teaching, and lounge areas have been established to support clinical operations, administration, and training.<\/p>\n\n\n\n<p>As part of the measures, the 1970s building was also renovated to improve its energy efficiency. In addition to improving the building envelope, photovoltaic systems were installed on the roof and facade surfaces.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Service phases<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Revision of third-party planning draft LPH 3<\/li>\n\n\n\n<li>Approval planning LPH 4<\/li>\n\n\n\n<li>Implementation planning LPH 5<\/li>\n\n\n\n<li>Preparation of the award of LPH 6<\/li>\n\n\n\n<li>Participation in the award of LPH 7<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Key Data for Renovation<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>35,000 m\u00b2 GFA building area<\/li>\n\n\n\n<li>3.5MW heating system<\/li>\n\n\n\n<li>Refrigeration and cooling system 2.4MW<\/li>\n\n\n\n<li>Heat recovery systems ~1.2MW<\/li>\n\n\n\n<li>Air volume ~150,000 m\u00b3\/h<\/li>\n\n\n\n<li>Cleanroom ventilation technology and operating theatre ventilation systems<\/li>\n\n\n\n<li>Electrical connection rating 2.7MW<\/li>\n\n\n\n<li>Dynamic UPS System 490kVA<\/li>\n\n\n\n<li>Integration of new systems into existing systems<\/li>\n\n\n\n<li>Renovation and refurbishment measures during ongoing hospital operations<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Key data of the energy refurbishment<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Intelligent shading and sun protection<\/li>\n\n\n\n<li>Photovoltaic system roof ~200kWp<\/li>\n\n\n\n<li>Photovoltaic system facade ~40kWp<\/li>\n\n\n\n<li>Optimisation of heating systems<\/li>\n\n\n\n<li>Renovation and refurbishment measures during ongoing hospital operations<\/li>\n<\/ul>","protected":false},"featured_media":10054,"template":"","meta":{"_acf_changed":false},"class_list":["post-9501","projekt","type-projekt","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/staging1.rkp-marketing.at\/en\/wp-json\/wp\/v2\/projekt\/9501","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/staging1.rkp-marketing.at\/en\/wp-json\/wp\/v2\/projekt"}],"about":[{"href":"https:\/\/staging1.rkp-marketing.at\/en\/wp-json\/wp\/v2\/types\/projekt"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/staging1.rkp-marketing.at\/en\/wp-json\/wp\/v2\/media\/10054"}],"wp:attachment":[{"href":"https:\/\/staging1.rkp-marketing.at\/en\/wp-json\/wp\/v2\/media?parent=9501"}],"curies":[{"name":"what","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}